Site selection
Location
The abattoir should not be located close to dwellings, schools, churches and other public or commercial buildings due to possible nuisance from noise, smell congestion etc. Likely future commercial and residential developments should also be taken into account.
Accessibility
The site should be accessible from a permanent road to allow ready transport of both livestock and meat.
Water Supply
An adequate water supply is essential. While mains water is to be preferred, well or bore water will also be suitable provided the water meets drinking water standards. Quantities of 1000 litres per large animal 100 litres per small ruminant 450 litres per pig are desirable.
Effluent Disposal
The effluent disposal should be free draining and not subject to waterlogging or flooding. The direct contamination to water sources must be avoided.
Foundation Conditions
The site should be on a higher level than its surroundings. The slope, terrain, foundation and soil conditions on the site should be suitable for the construction of substantial, and permanent buildngs.
Solid Waste Disposal
There should be sufficient space available to bury inedible wastes and condemned animals and provide for compost stacks, hide drying frames etc.
Electricity
Connection to a public electricity supply is desirable especially if chilling of carcases is being considered or on site water pumping is required.