Course Content
Learn Farm Structure and Surveying with Rahul

Field Procedure

  • Reconnaissance
  • Preliminary study of area.
  • Prepare a key plan (index sketch) showing boundaries and features.
  • Marking Stations
  • Use ranging rods to mark temporary stations.
  • Reference Sketches
  • Mark stations with respect to permanent features.
  • Running Survey Lines
  • Begin from base line and proceed to cover all main and subsidiary lines.

 

Selection of Stations

  • Should be intervisible
  • Form well-conditioned triangles
  • Each triangle must have a check line
  • Tie lines to avoid long offsets
  • Preferably over flat ground and avoid obstacles

 

Base Line Selection & Measurement

  • Run through center of the area.
  • Measured horizontally with precision (2-3 times and take average).

 

  • Ensure straightness and place ideally on level ground.
  • If possible, use two perpendicular base lines.

 

Field Book & Booking

  • Records all field data.
  • Size: ~22.5 cm × 12.5 cm.
  • Single Line Book: One red center line; Double Line Book: Two blue center lines.
  • Entries start from bottom of page.
  • Use symbols for features; new chain line = new page.
  • Always face chaining direction when recording.
Scroll to Top